Project:
Disney's Winnie-the-Pooh movie .
Work:
Several elements for a large location build (Int London Train Station), including a structural victorian bridge.
Communicating with other departments to maintain the site plan. Four weeks on location in Dover helping with the install and shoot.
The bridge was the largest built element at this location.
It required careful liaison between the steel suppliers, the structural engineer and Construction, and incorporated almost 10,000 resin rivet heads.
Media:
3D and 2D VectorWorks
Production Designer: Jennifer Williams
Supervising Art Director:  Stuart Kearns
Before & After
Before & After
press to zoom
Site Plan
Site Plan
press to zoom
Exterior
Exterior
press to zoom
Entrance
Entrance
press to zoom
Entrace reverse
Entrace reverse
press to zoom
Boots and the Bridge
Boots and the Bridge
press to zoom
1/1
Bridge build
Bridge build
press to zoom
Bridge P&Es
Bridge P&Es
press to zoom
Bridge - Stair detail
Bridge - Stair detail
press to zoom
1/1
Cafe & Clock
Cafe & Clock
press to zoom
Clock P&Es
Clock P&Es
press to zoom
1/1
Buffers, Railings & Gates
Buffers, Railings & Gates
press to zoom
Buffers P&Es
Buffers P&Es
press to zoom
1/1