Project:
Disney's Winnie-the-Pooh movie .
Work:
Several elements for a large location build (Int London Train Station), including a structural victorian bridge.
Communicating with other departments to maintain the site plan. Four weeks on location in Dover helping with the install and shoot.
The bridge was the largest built element at this location.
It required careful liaison between the steel suppliers, the structural engineer and Construction, and incorporated almost 10,000 resin rivet heads.
Media:
3D and 2D VectorWorks
Production Designer: Jennifer Williams
Supervising Art Director:  Stuart Kearns